METHOD OF PROTECTING A METAL PIPE PENETRATING WALL AND FLOOR  ACCORDING TO ETA-17/1062

1.png

1 - flexible wall with a thickness of min. 100 mm
2 - metal pipe, diameter "D" and pipe wall thickness "t"
3 - PiroCoat I, dimensions: length L = min. 500 mm, thickness s1 = min.
     1.2 mm, paste additionally used for length g1 = min. 5 mm, inside the partition
4 - the space between the pipe and the partition structure,
     max. a = 30 mm, filled with mineral wool with a density of min. 50 kg/m3
5 - gypsum mortar with a thickness of min. g1 = 5 mm

Technical drawing 1

1 - rigid wall with a thickness of min. 100 mm
2 - metal pipe, diameter "D" and pipe wall thickness "t"
3 - PiroCoat I, dimensions: length L = min. 500 mm, thickness s1 = min.
     1.2 mm, paste additionally used for length g1 = min. 5 mm, inside the partition
4 - the space between the pipe and the partition structure, max. a = 30 mm,
     filled with mineral wool with a density of min. 50 kg/m3
5 - gypsum mortar with a thickness of min. g1 = 5 mm

2.png
Technical drawing 2
3.png

1 - rigid wall with a thickness of min. 150 mm
2 - metal pipe; diameter "D" and pipe wall thickness "t"
3 - PiroCoat I (pipe cover), length L = min. 500 mm and thickness g1 = min. 1.2 mm
4 - PiroCoat I (ring on the wall around the penetration seal), length e = min.
     50 mm and thickness g2 = min. 0.6 mm
5 - the space between the pipe and the partition structure filled with mineral wool with       
     density of min. 50 kg/m3 or with cement mortar, width max. u = 30 mm

Technical drawing 3

1 - floor with a thickness of min. 150 mm
2 - metal pipe, diameter "D" and pipe wall thickness "t"
3 - PiroCoat I (pipe cover), thickness g1 = min. 1.2 mm and min. 500 mm
4 - PiroCoat I (ring on the floor around the penetration seal),
thickness g2 = min. 0.6 mm; length e = min. 60 mm
5 - the space between the pipe and the partition structure filled with cement
mortar thickness u = max. 15 mm

4.png
Technical drawing 4
Pasta I rury stalowe bez izolacji rysunek 1.jpeg

Fill the space between the
pipe and the partition tightly.
Use mineral wool with a density of min. 60 kg/m3 or cement mortar.

Steps 1 - 5

By using a brush, apply PiroCoat I on the partition in such a way that a ring with a width of min. 50mm and a minimum thickness of 0.6 mm is created.

Pasta I rury stalowe bez izolacji rysunek 2.jpeg
Pasta I rury stalowe bez izolacji rysunek 3.jpeg

Apply PiroCoat I on the pipe
so that a ring with a width of
min. 500 mm and a thickness
of min. 1.2 mm is created.

The protection should be done
on both sides of the partition,
both in wall and floor.

Pasta I rury stalowe bez izolacji rysunek 4.png
Pasta I rury stalowe bez izolacji rysunek 5.png

Mark the completed penetration seal with the label. Mark PiroCoat I on it, enter the date and the  name.

Have questions?