top of page

METHOD OF PROTECTING A PLASTIC PIPE WITHOUT INSULATION WITH CABLE BUNDLES INSIDE ACCORDING TO ETA-17/1061

1.png

1 - flexible or rigid wall with a thickness of B = min. 100 mm
2 - plastic pipe, diameter "D" and pipe wall thickness "t"; with a bundle of cables inside,           with a diameter of 60 mm, consisting of a maximum of 5 cables with a diameter not             greater than 13 mm
3 - Piro MULTITUBE PM with dimensions [h x s] placed centrally inside the wall
4 - cable tie or adhesive tape
5 - the gap between the pipe and the partition, width "a", filled mineral wool with a density
     of min. 60 kg/m3
6 - gypsum mortar with a thickness of g1 = min. 5 mm

Technical drawing 1
Steps 1 - 5
E Pipe przeznaczenie 1.png

Place EPipe in the hole so that its black part is centrally located inside the partition.

Fill the empty space between the partition and the duct with cement mortar.

E Pipe zastosowanie 2.png
E Pipe zastosowanie 3.png

Cut off the parts of EPipe on both sides of the partition by means of saw.

Run cables inside the duct (cables should cover no more than 60% of the duct fill).

E Pipe zastosowanie 4.png
EPipe zastosowanie 5.jpg

Plug the remaining free space of the duct with the provided plugs.

Have questions?

A qualified team of Pirosystem can help in the selection of passive fire protection system and other fire protection solutions.

bottom of page