METHOD OF PROTECTING METAL AND PLASTIC PIPE IN FEF INSULATION PENETRATING A FLEXIBLE WALL ACCORDING TO ETA-17/1063

1.png

1 - flexible or rigid wall with a thickness of B = min. 125 mm
2 - metal or plastic pipe, diameter "D" and pipe wall thickness "t"; the
     space between the pipe insulation and the wall structure u = max. 15 mm
3 - continuous insulation made of flexible elastomeric foam (FEF), Thickness "G", nominal       density 45 ÷ 70 kg/m3 and     reaction to fire class BL-s2, d0 according to EN 13501-1
4 - Piro Collar PC on the outside of the wall, mounted on both sides of walls
5 - fire collar mounting - steel expansion anchor bolt M6x60 or M8x80

Technical drawing
Carbo Collar Rury Metalowe w kauczuku ściana GK 1.png

Fill the space between the pipe insulation and the partition tightly. Use mineral wool with a density of min. 60kg/m3

Steps 1 - 5

Place the collar on the pipe insulation. In case of collars with a diameter of PC-125 and larger L, first wrap the pipe four times with an intumescent insert and then put the steel cover on top.

Carbo Collar Rury Metalowe w kauczuku ściana GK 2.png
Carbo Collar Rury Metalowe w kauczuku ściana GK 3.png

Pull the locking pin of the clamp through the fixing slot on the other end of the collar and fold it 180° backwards so that the collar is firmly closed on the pipe.

Attach fire collar to the plasterboard with expansion anchor bolts. Do not use expansion anchor bolts containing plastic elements.

Carbo Collar Rury Metalowe w kauczuku ściana GK 4.png
Carbo Collar Rury Metalowe w kauczuku ściana GK 5.png

Mark the completed penetration seal with the label attached to the set. Mark Piro Collar PC on it, enter the date and the name.

Carbo Collar Rury Palne w kauczuku ściana GK 1.png

Fill the space between the pipe insulation and the partition tightly. Use mineral wool with a density of min. 60kg/m3

Steps 1 - 5

Place the collar on the pipe insulation. In case of collars with a diameter of PC-125 and larger L, first wrap the pipe four times with an intumescent insert and then put the steel cover on top.

Carbo Collar Rury Palne w kauczuku ściana GK 2.png
Carbo Collar Rury Palne w kauczuku ściana GK 3.png

Pull the locking pin of the clamp through the fixing slot on the other end of the collar and fold it 180° backwards so that the collar is firmly closed on the pipe.

Attach fire collar to the plasterboard with expansion anchor bolts. Do not use expansion anchor bolts containing plastic elements.

Carbo Collar Rury Palne w kauczuku ściana GK 4.png
Carbo Collar Rury Palne w kauczuku ściana GK 5.png

Mark the completed penetration seal with the label attached to the set. Mark Piro Collar PC on it, enter the date and the name.